Underground service to 40 lots
Trenched and bored primary, set transformers, and pulled secondary to each pad for a new residential development.
Trenched and bored primary, set transformers, and pulled secondary to each pad for a new residential development.
Directional bore beneath a state highway to carry a fiber duct package without cutting the pavement.
Set poles, bored feeds, and wired photocell-controlled lighting for a commercial yard and its entrance road.
Pulled new primary through existing duct and re-terminated at the transformers with no extended outage.
Relocated conflicting electric and comm out of a planned improvement footprint and restored the ground.
Bored a casing beneath a creek to carry a water line across without disturbing the bank.
Built a concrete-encased duct bank and set handholes ahead of a commercial building service.
Poured pads, set pad-mount transformers, and terminated primary and secondary for a small commercial loop.
Daylighted a congested corridor to verify existing lines, then graded, seeded, and patched concrete behind the work.
Locations are representative of the kind of work described. Photos illustrate the type of job and may not depict a specific Pro-Tech project.
Send the drawings or call the shop, we'll walk the job and get you a number.